The Glen Oaks Campus Complex was a fast-track, design-build
two-year project. It consisted of two new five-story 130,000 s. f. intermediate
schools and one new eight-story 180,000 s. f. high school, all located
on a 20-acre site. Five Star Electric performed all the electrical work
on this job including Con Edison Networks for a 480V incoming service
and distribution throughout the site as well as all low voltage systems
including fire alarm, telecommunications, fiber optics, public address,
CCTV and audio-visual systems. Five Star also installed all site lighting
and traffic signal work for the campus. The construction team members
included: Leon D. DeMatties Construction, general contractor, John Ciardullo
Associates, P.C., project architect, and D.V.L. Consulting Engineers,
project engineer. The owner was the New York City School Construction
Authority.
Return
to Education
|
|
Glen Oaks, NY
Design-Build/New Construction
Three schools, 440,000 s. f.
Leon D. DeMatteis
John Ciardullo
D.V.L Consulting
SCA
|
| |
|